Main Hall Office Remodel

Project No. 19-006 Main Hall University Development Office Remodel

  • Accepting bids for the Main Hall University Development Office Remodel project.

Project Design Documents

Mandatory Pre-Bid Meeting:  Tuesday, November 13, 2018 @ 10:00 AM MST

Meeting Location:  Main Hall Building - Third floor room 301

Bids Due:  Wednesday, November 28, 2018 @ 2:00 PM MST - CSB 204

Bid Tabulation Form, POSTED November 28, 2018

BID FORM:  Bidders are required to use the Bid form attached to the bidding documents.  Each bidder is required to bid on all alternates and indicate the time from the date of the Notice to Proceed to Substantial Completion in calendar days, and in addition, the bidder is required to indicate the period of time to finally complete the project from Substantial Completion to Final Acceptance, also in calendar days.  Bids indicating times for Substantial Completion and Final Acceptance in excess of the number of days indicated in the Advertisement for Bids for completion of the entire Project may be found non-responsive and may be rejected. The bid shall not be modified or conditioned in any manner.  Bids shall be submitted in sealed envelopes bearing the address and information shown below.  If a bid is submitted by mail, this aforementioned sealed envelope should be enclosed in an outer envelope and sent to the following addressee:

Mariness Falcon

UCCS Project Manager

Campus Services 204

University of Colorado, Colorado Springs

1420 Austin Bluffs Parkway

Colorado Springs, CO 80918

 

The outside of the sealed inner envelope should bear the following information:

Project #  19006                                            

Project Name     Main Hall University Development Office Remodel                          

Name and Address of Bidder

Date of Opening                             

Time of Opening

 

All bids shall contain the following:

  • Bid Form
  • Bid Alternate form, if applicable
  • Your Schedule for the Project. This schedule must be of sufficient detail to demonstrate understanding of the work and ability to substantially complete the work in the stipulated timeframes.
  • Bid Bond with proper security, if bid is $50,000 or over

Any bid received after this date and time will not be accepted.

 

Time of Substantial Completion: Construction starts Dec. 12, 2018 and ends Mar 15, 2019

Time Period from Substantial Completion to Final Acceptance: 10 calendar days (Mar. 25, 2019)

 

 

 

 

       

      Last Reviewed:  27 MAR 2019  DL

      decorative image