Common Area Damage List

This listing is for all of the Common Area Damage to housing facilities for Spring 2008.  We are posting this online as a resource for our students to see what is being done on their floors, and hopefully to assist us in prevention.  Please note that all of the damages listed here will be charged back to the community at the end of each semester, unless the person responsible is identified.  If you have information about any of these incidents, please click here to submit anonymous information to the Residence Life Staff.

Totals for Fall 2007 - Summit Village: $1,900.00 or $4.18 per resident
Totals for Fall 2007 - Alpine Village: $1,185.00 or $5.17 per resident

Please note that we consider vandalism to bulletin boards very important.  The removal of information that is posted for the benefit of other residents steals the opportunity for the community to gain information about University activities and announcements.  This is also the same for floor decorations, as Residents at RA's have spent a considerable amount of time trying to improve your community.  There will be a minimum $100.00 fine for either act.




Date_of_Incident: 12/00/07
Building: Keystone House
Floor: 2nd Floor
Area_of_Incident: All over Several Hall Walls
Damage_Cost: 200.00
Reporting_Date: 01/18/08

Damage_Description

On two different occasions some wrote on the walls the word SHRED. Vandalism charge $100 each occurance. This will be charged to the ten or eleven of you here for winter break.


Date_of_Incident: 12/00/07
Building: Keystone House
Floor: 2nd Floor
Area_of_Incident: All over Several Hall Walls
Damage_Cost: 200.00
Reporting_Date: 01/18/08

Damage_Description

On two different occasions some wrote on the walls the word SHRED. Vandalism charge $100 each occurance. This will be charged to the ten or eleven of you here for winter break.


Date_of_Incident: 01/17/08
Building: Keystone House
Floor: 2nd Floor
Area_of_Incident: Hallway to 2nd Telluride
Damage_Cost: 100.00
Reporting_Date: 01/24/08

Damage_Description

Wrote SHRED on wall again. ONLY RESIDENTS PRIOR TO JANUARY 20th WILL BE CHARGED. By the way just for your information you are up to $300.00.


Date_of_Incident: 02/03/08
Building: Monarch House
Floor: 1st Floor
Area_of_Incident: Inside Elevator
Damage_Cost: 150.00
Reporting_Date: 02/11/08

Damage_Description

Someone stole the first floor call button.


Date_of_Incident: 02/03/08
Building: Breckenridge House
Floor: 2nd Floor
Area_of_Incident: By water fountain
Damage_Cost: 125.00
Reporting_Date: 02/11/08

Damage_Description

Someone smashed a apple on the wall and pieces all over the floor.


Date_of_Incident: 02/03/08
Building: Keystone House
Floor: 4th Floor
Area_of_Incident: Stairwell
Damage_Cost: 115.00
Reporting_Date: 02/11/08

Damage_Description

Someone tore down floor designation sign. This is a safety issue.


Date_of_Incident: 02/06/08
Building: Aspen House
Floor: 1st Floor
Area_of_Incident: Bulletin board
Damage_Cost: 100.00
Reporting_Date: 02/15/08

Damage_Description

Someone removed all the information from the board and threw it all over the floor.


Date_of_Incident: xx/xx/xx
Building: Monarch House
Floor: 1st Floor
Area_of_Incident: test
Damage_Cost: 0
Reporting_Date: xx/xx/xx

Damage_Description

test


Date_of_Incident: 03-24-08
Building: Monarch House
Floor: 4th Floor
Area_of_Incident: 4th floor elevator.
Damage_Cost: 50.00
Reporting_Date: 04-04-08

Damage_Description

Someone punched a hole in the wall next to the elevator.


Date_of_Incident: 03-24-08
Building: Keystone House
Floor: 4th Floor
Area_of_Incident: 3414 Storage room
Damage_Cost: 75.00
Reporting_Date: 04-04-08

Damage_Description

Someone broke off the corners of the number sign outside of the storage room on 4th Keystone.