Recently Completed Projects

Monarch Lounge Remodel

The construction time frame for this project is December 20, 2010-January 14, 2010.

Walk through for project will be Thursday, November 4, 2010 11:00 am at Monarch in the Summit Housing Village.

Bids are due, via email to rtaylor@uccs.edu by November 16, 2010 11:00 am.

Bid Documents

Bid Form

Bid Alternates Form

Vendors attending Pre bid meeting

Campus Map

Bid Tabulation Form on this project the apparent low bidder, Brazos withdrew their bid.

Awarded to: Copestone Company

Drawings

UCM_101028_I0.0.pdf

UCM_101028_I0.1.pdf

UCM_101028_I1.0.pdf

UCM_101028_I1.1.pdf

UCM_101028_I1.2.pdf

UCM_101028_I2.0.pdf

UCM_101028_I2.1.pdf

Addendums

Addendum 1

1. Add1

Add 1I

Add 1I

Add1I1

Add1I2

Addendum 2

Furniture Specifications

BS_1.pdf

STG_1.pdf

STG_2.pdf

STG_3.pdf

STG_4.pdf

STG_5.pdf

STG_6.pdf

STG_7.pdf

TBL_1.pdf

TBL_2.pdf

TBL_3.pdf

TBL_4.pdf

TBL_5.pdf

TBL_6.pdf

UCCSMonarchHouseCoverPage.pdf

UCCSMonarchHouseTableofContents.pdf

11-002 Rooftop PV Solar System Installation Centennial Hall

Bid Documents/ Project Documents

Request for Design/Build Proposal

Corrected RFP 7/22/10

Information for Bidders

Bid

Bid Bond

Design Build Agreement

General Conditions

Performance Bond

Labor Bond

Mandatory Meeting Sign In Roster

 

University Hall Boiler Project

Bid Documents

Project Manual without State forms 9-28-10

Bid

Drawings 9-28-10

Addendum No.1

Addendum No.2

Electrical Specifications - Division 16

Electrical Drawings

Boiler Quotation

 

10-018 Alpine Village Landscaping

The project consists of four key elements:

1. Hardscape improvements - sidewalks, concrete stepping stone walks, stairs, plaza and stage paving, and seat walls.
2. Drainage improvements - area drains, storm water piping, and rip-rap.
3. Planting improvements - new trees, shrubs, ground covers, lawn repair and associated irrigation modifications along with the design of the irrigation improvements
4. Site amenities - Pole-mounted signage, new gas grill with gas line extension, new and owner furnished/ contractor installed site lighting, and relocated trash receptacles.

The project will be installed in two phases due to winter season constraints. Hardscape and drainage improvements to the extent possible shall be installed in 2009. Planting improvements and the site amenities shall be installed in the spring of 2010. Bidders shall include an itemized breakdown of the work anticipated in each of these phases along with schedules for each phase of the work. Some limited re-grading will be required, along with state-required erosion control measures.

Project Specs

Ad for Bids

Sign in roster

Information for Bidders

Bid

Bid Bond

Bid Alternates

Performance Bond

Labor bond

MWBE

IA

Addendum #1

Addendum #2

Addendum #2 Spotlight

Addendum #3

 

Questions:

Company: GH Phipps

FINAL BID TABULATION


10-084 CONTRACTOR FOR HELLER REHABILITATION
(Drawings and specs will not be ready until after 3/24/10)

Bid Documents

WE ARE EXTENDING THE DATE FOR CONTRACTORS THAT HAVE SIGNED THE MANDOTORY ROSTER TO SUBMIT QUESTIONS TO FRIDAY, APRIL, 9, 2010 BY 5:00 PM. ALL QUESTIONS MUST BE SUBMITTED VIA EMAIL ONLY TO RTAYLOR@UCCS.EDU. ANSWERS WILL BE POSTED ON THIS SITE , MONDAY, APRIL 12, 2010 5:00 PM.

 

Ad for Bids

State Form for bid submittal

Information for Bidders

BID

Bid Alt if needed

Bid Bond

HELLER SPECS

HELLER DRAWINGS

Sign in Roster

Contract

Terms and Conditions

Performance Bond

Labor and Material Bond

There is temporary lighting in the Heller House and it is available for inspection on Friday, April 2, from 1:00 pm to 3:00 pm and Monday, April 5, from 1:00 pm to 3:00 pm.

Stan will be at the storage facility at 3650 N. Nevada on Tuesday, April 6 from 1:00 pm to 3:00 pm to give bidders a chance to evaluate the light fixtures and railings we will be installing.

Addendum 1

Addendum II

Bid Appendix

CX1.0

C-DP

Bid Tabulation form

 

 

 

 

 

Questions:

Company: GH Phipps


10-081 PUB REMODEL

Bid Documents

Ad for Bids

Pub Drawings

Specifications

STATE FORMS TO SUBMIT BIDS

Information For Bidders

BID

Bid Alt if needed

Bid Bond

Mandatory Sign in Roster

Contract

Terms and Conditions

Performance Bond

Labor Bond

Addendum #1

Bid Tab Form

 

Questions: Questions and Answers

Company:The Copestone Company


10-089 SENG 215/216 Renovation

Bid Documents:

scieng

Ad For Bids

Information for Bidders

Bid

Bid Alt

Bid Bond

Contract

Terms and Conditions

Performance Bond

Labor Bond

Drawings

Mandatory Sign In Roster

Bid Sheet

Questions:

1) At the pre-bid, you mentioned that the original tables were provided/installed by KT.  I am not familiar with this company.  Do you have any contact information?

A: Here is Carl’s info.

Carl Canter
ccanter@ccanter.com
720.932.7474 (t)
720.956.0563 (f)
Improve your Environment

2) Are there any liquidated damages in this solicitation?

A) No liquidated damages

Company: Wells & West General Contractors, Inc.


10-086 UCCS LOT 3 AND 4 ASPHALT REPAIR

Bid Documents

Ad for Bid

Drawings

Specifications

Sign in Roster

Addendum #1

Addendum #2

Addendum #3

Bid Sheet

 

 

Questions:

Company: Lafarge West, Inc.

Event Center

The Events Center will consist of an addition to the existing University Center of approximately 27,000 gross square feet located adjacent to the existing gymnasium, with an upper level connection to Dwire Hall. The building will be faced with brick, and aluminum storefront and glass to be architecturally compatible with the existing buildings. The main interior space will be a single level multi-use space accommodating a gymnasium with collapsible bleachers to seat 1,400 spectators. Ancillary spaces will be accommodated on three levels next to the multi-use space.

Project Architect and LEED Consultant :
Christopher Carvell Architects


CMGC
:
GH Phipps Construction


Cardio RoomUpper Level
Project Specs

Utilities Infrastructure UCCS Events Center

Advertisement for Bids

Mandatory meeting sign in roster

Plan Holder list

Contractors Agreement

MWBE

UI

Facility Program Plan

 

Project Status

Regents approved project at last meeting
Architects selected for short list
Christopher Carvell Architects Selected
RFP for CM/GC advertised
SELECTED CM/GC: GH PHIPPS
Selected Geotechnical Co: Kumar
Code Review: Code Consultants International



PEDESTRIAN SPINE PHASE II

Open to pre qualified vendors only.
Bid Documents

Specifications

Roster

Addendum 1

Addendum 2

PSII C0.0

PSII C1.0

PSII C2.0

PSII C2.1

Bid Sheet

Questions:

Company: Pioneer Sand Company


Replace University Hall RTU's at the UCCS Campus

Replacement of rooftop air handling and condensing units and energy efficient ventilation control stragegies.
Project Specs

Advertisement For Bids

Site Plans

University Hall classroom schedule

Specifications

Drawings #1 #2 #3 #4 #5 #6

Sign in Roster

Addendum No. 1

Bid Tabulation form

 

Questions:

Company:


10/11 Standing Order Contract for Small Projects

Prequalifiy for Standing Order Contract list for UCCS small projects under $150,000.00

Project Specs

RFP

Title Page of Submittal

Acknowledgment and Attestation Form (Partnership)

Acknowledgment and Attestation Form (Corporation)

Acknowledgment and Attestation Form (Joint)

Acknowledgment and Attestation Form (Sole)

Certificate of Insurance Example

General Conditions - REVISED 02/12/10

Certification/Affidavit Regarding Illegal Aliens

Housing Conditions

Insurance Requirements

Minority/Women Business Enterprise Form

Proposal Sample

CU-W9

Attendance Sheet - Mandatory Meeting 02/09/10

Addendum 1 - 02/15/10

2010-11 Standing Order Contract Program List

 

Questions:

Amendments:
Project Company:

09-063 West Lawn Grading and Flatwork

Project includes demolition of existing parking lot area of approx. .07 acres followed by over lot grading; minor storm sewer improvements; demolition and rebuilding 175 lineal feet of road including curb and gutter with asphalt; installation of approx. 500 lineal feet of concrete fire lane and "signature" pedestrian spine.

Project Specs

Advertisement for bids

Parking map for mandatory meeting Thrusday, April 16th, 2009 2:00 to 3:00 pm in University Center Room 116

Sign in Roster

West Lawn Drawings Cover Sheet

West Lawn Demo Plan

West Lawn Plan

West Lawn Details

Questions:

1.       Do you have any landscape or irrigation drawings that you can provide for reference. A: NO

2.       Can you provide numbered address for Eagle Rock storage area. A: Behind the Eagle Rock Modular buildings which are referred to as buildings 201 to 204 on the UCCS Campus Map.

3.       Can you provide numbered address for Nevada storage area. A: The area is located north of the drainage way which is north of the Four Diamonds Sports Complex at 5025 N. Nevada Avenue.

4.       The re-grading south of the pedestrian spine will be regarded, what will the finished product be for landscaping?  Will this area be irrigated if sod or seeded? A: Sod with irrigation


5.       The re-grading against the existing building, what will the finished product be for landscaping?  Will this area be irrigated if sod or seeded? A: The West Lawn limit does not reach the building, it extends only to the curb along the northern edge of the parking lot. The Engineering building project is responsible for the area from the building to the north side of the curb. The west lawn contractor will be required to remove the curb.

6.       Can we use a temporary metal concrete wash out in lieu of a permanent dug in type? A: Temporary wash out is acceptable but must be in sufficient quantity and size to contain all liquid and concrete waste generated by washout operations.

7. Bid Form, item 8, please clarify what is required with regard to the reference to submit wage rates for the prime and subcontractors. A: The construction documents do not contain a specific request for wage rates - therefore these are not required.

8. General Conditions, page 8, article 9, B, states that the contractor shall secure and pay for all permits required to complete the work.  In addition to the erosion control permit, please specify those that are required. A: No other permits are required beyond the CDPHE Stormwater Construction Permit.

9. General Conditions, page 20, article 25, Insurance, C, Builders Risk Insurance, if it is desired that the general contractor include in their bid a builders risk policy, please state the amount of coverage the policy should be based on, otherwise, confirm none is required. A: Builders Risk Insurance is not required for projects under $1,000,000.

10. Section 01 50 00 Temporary Facilities & Controls, 3.02, C, please specify the reference to “trucked in electrical service”.  Is this a requirement of this project or left over from another?  For no more electricity than we will need during construction, couldn’t we just use the existing facilities?  Similar question with regard to water. A: The Owner does not provide utility services for use by the Contractor. The Contractor shall provide a power source as needed, and either truck in water or secure a Temporary Water Service Permit (Fire Hydrant Use) from Colorado Springs Utilities.

11. Section 01 51 00, is it required that the construction staking be completed by a licensed surveyor?  Please clarify exactly what the owner will provide, with regard to a project benchmark and electronic grading information. A: Yes - construction staking must be performed by a licensed surveyor. Owner will provide temporary site benchmark locations (which are tied to the Colorado Springs Utilities FIMS control), and a CAD file with contours, spot elevation, and improvement locations which shall be used  in conjunction with the plan and profiles.

12. Section 31 20 00, is there a soils report available for the existing on site soils expected to be encountered in the over excavated area below the existing pavement, as discussed during the pre-bid meeting? A:Soil information will be posted on the West Lawn project listing under the UCCS Facilities Service Department.

13. Section 32 12 16, 2, B, 2, states that soft spots encountered during the proof rolling operation shall be repaired at the contractor’s expense?  Please specify the quantity and exact size of the referenced soft spots so that we can include them in our bid, otherwise, state that the repair of the soft spots will be accomplished through a change order or unit price proposal. A: If soft spots are highlighted during proof rolling - any additional direction to the Contractor will be provided in a change order.

14. Section 32 13 13.3, 3.16, D, please clarify that in addition to applying curing compound to all new horizontal concrete surfaces, it is also required to cover the referenced surfaces for 7 days with 6 mil plastic? A: All portions of concrete spine (regular and colored concrete) shall be cured with liquid membrane forming curing compound and shall not be covered with plastic sheeting.

15. Sheet CO.O, Coordination Requirements, note 3, can the pedestrian spine mock up be a part of the permanent work? A: Yes if the entire mock up is acceptable to Owner.

16. Sheet C2.0, what is minimum thickness of the import top soil? A: 10 inches.

17. Sheet C2.0, note 16, is it desired to remove the existing rectangular storm inlet and grated cover and replace with a 4’ diameter concrete manhole with solid cover? A: Yes.

18. Is caulking of the joints at the location of dissimilar concrete colors required? A: the plans do not include this.

19. Please clarify the colored concrete requirements in terms of pounds of color per sack of cement.  Is the specified 4% Chromix 1589 Durango Brown equal to a 4 lbs./cy color mix?  (Manufacturers have different names for their available colors and most manufacturers indicate the amount of color in terms of pounds of color per 94 lb. sack of cement.) A: do what the color card you took the color from indicated.

20. How long are the “ #4 tie bars ”.  Are they simply rebar dowels?  Is it intended that they be located on each side of both the longitudinal and transverse 24” wide colored strips, extending in to all sides of the grey infill’s/strips?  (or just the outside of the longitudinal strip as indicated on the addendum drawing?) A: See addendum #2.

21. Is caulking of the joints at the location of dissimilar concrete colors required? A: No.

22. Please clarify the colored concrete requirements in terms of pounds of color per sack of cement.  Is the specified 4% Chromix 1589 Durango Brown equal to a 4 lbs./cy color mix?  (Manufacturers have different names for their available colors and most manufacturers indicate the amount of color in terms of pounds of color per 94 lb. sack of cement.) A: The Chromix colors work as an additive that is premeasured and added per cubic yard of concrete.

23. How long are the “ #4 tie bars ”.  Are they simply rebar dowels?  Is it intended that they be located on each side of both the longitudinal and transverse 24” wide colored strips, extending in to all sides of the grey infill’s/strips?  (or just the outside of the longitudinal strip as indicated on the addendum drawing?) A: See addendum #2.

Amendments:

Addendum 1

Pedestrian Spine Detail

Addendum 2

Pedestrian Spine Detail 2

West Lawn Soil Information

Specification for West Lawn

Project Company: Pioneer Sand Company