3650 North Nevada - Renovation Phase I
3750 North Nevada - Fire Suppression
Campus Wide - Motion Sensor Upgrade
Campus Wide - Voice Over Internet Protocol (VOIP) Project
Lane Center for Academic Health Sciences 1
Lane Center for Academic Health Sciences 2
North Nevada Northwest Sign
Summit Village Expansion
Summit Village Expansion CMGC
UCCS Greenhouse
University Center - Audio/Visual Upgrade
University Center - 1st Floor Renovation
University Hall - Acoustics
University Hall - Fire Sprinkler System 1
University Hall - Fire Sprinkler System 2
University Hall - Simulation Lab
Project Awarded to : GE Johnson
Short listed companies:
GE Johnson
JE Dunn
GH Phipps
Preliminary Geotechnical Investigation
Sign in roster for mandatory meeting
Appendices:
A) Prequalify Submittal/Evaluation Form
A1) Oral Interview/Evaluation Form
A2) Submittal and Interview Ranking Matrix
B) Example of Construction Manager/General Contractor Agreement (sample) with CM/GC Designated Services and Method of Payment Matrix and CM/GC Certification (form SC 6.4)
C) Certification and Affidavit Regarding Unauthorized Immigrants
General Contractor Awarded to Whiting-Turner
Sign in roster for mandatory meeting
Sign in roster for mandatory meeting
Appendices:
A) Prequalify Submittal/Evaluation Form
A1) Oral Interview/Evaluation Form
A2) Submittal and Interview Ranking Matrix
B) Specimen of Construction Manager/General Contractor Agreement (sample) with CM/GC Designated Services and Method of Payment Matrix and CM/GC Certification (form SC 6.4)
C) Certification and Affidavit Regarding Unauthorized Immigrants
Find Floor Plans at: http://www.uccs.edu/facsrvs/Maps-and-Floor-Plans.html
Firms selected for the Short List on Summit Village Expansion project:
Page Southerland Page Architects
SlaterPaull Architects
NAC Architecture
H and L Architecture
SBP Form 7.3 Notice of Contractor's Settlement
Short listed companies:
JE Dunn
Bryan Construction
Nunn Construction
AWARDED TO BRYAN CONSTRUCTION
Additional Question:
In regards to the past performance projects that are referenced, do the projects need to be 100% complete? If not, what % do they need to be complete in order to use them?
Yes, the projects need to be complete so that reference checks can include project closeout issues such as O&M manuals, as-built drawings, tax refund, etc.
• In regards to the minimum qualification that states an applicant must have two (2) projects each in excess of $2,500,000 utilizing the expertise in their Colorado office – do they have to be stand alone projects or can they be design-build contracts (one contract) with task orders that combined, surpass the $2.5 threshold?
The contract can be one design-build contract that, in total, equals or surpasses the $2.5 million threshold.
Sign in roster for mandatory meeting held 3/4/2011
Appendices:
A) Prequalify Submittal/Evaluation Form
A1) Oral Interview/Evaluation Form
A2) Submittal and Interview Ranking Matrix
B) Specimen of Construction Manager/General Contractor Agreement (sample) with CM/GC Designated Services and Method of Payment Matrix and CM/GC Certification (form SC 6.4)
C) Certification and Affidavit Regarding Unauthorized Immigrants
D) Conceptual Design Drawings
3750 N. Nevada Fire Suppression
Design and install retrofit to Existing Fire protection system to ensure compliance with NFPA 13 and CSFD requirements. Aprox. 37,700 sf area to be used for storage shall be designed for low head room storage below 12 ft.
Mandatory meeting: 2.22.2012 10:00 am in the Campus Services Bldg. 204. See attachments below for additional information: Ad for Bids
University Insurance Requirements
University Center Audio Visual Upgrade
Install audio visual sytem in the University Center at the University of Colorado Colorado Springs. Please see following attachments for full information on this project.
Basic Communication Requirements
Sign in Roster from Mandatory meeting
Mandatory meeting: February 20, 2012 1:00 pm University Center Room 124 Bids Due: Friday, February 24, 2012 at 2:00 pm to the Facilities Services Bldg. Conf Room 204
Common work Hangers and Supports
Project awarded to: Copestone Company
Addendum No. 1
Attendance Sheet for Mandatory Pre-Bid Meeting
SC 6.21 Contractor's Agreement
SC 6.23 General Conditions of the Contract
SC 6.221 Labor and Material Payment Bond
Unauthorized Immigrants State Form
N. Nevada Northwest Sign Landscape Specs Campus Monument Sign
Simulation Lab - University Hall
GC Contract awarded to: Golden Triangle Construction of Southern Colordao, Inc.
SBP 7.3 Notice of Contractor's Settlement
NOTE: Additional questions will be answered along with the posting of an addendum on Monday, Dec. 5, 2011
Drawing for Sim Lab
NOTE: Additional questions will be answered along with the posting of an addendum on Monday, Dec. 5, 2011
Sign-in Roster for Mandatory Meeting
LKA Project Manual Drawings and Specs
|
Motion Sensor Upgrade |
|
Drawings Drawings can be viewed using either Adobe Acrobat Reader for ".pdf" files or Autodesk DWG TrueView for ".dwg" files. Click http://www.adobe.com/products/acrobat/readstep2.html to download Adobe Acrobat Reader Click http://usa.autodesk.com/adsk/servlet/pc/index?id=6703438&siteID=123112 to download Autodesk DWG TrueView. Right click or option-click the links below and choose "Save As..." or "Save Link As..." to download the drawings and open with DWG Viewer or PDF Viewer in your system. |
|
Cragmor Hall
|
||
|
Dwire Hall
|
||
|
Engineering & Applied Sciences
|
||
|
Main Hall
|
|
Project No: 11-031 Pre-Bid Meeting Sealed Bids will be received from qualified contractors until this date and time at this location: |
|
Project No: 11-032 Sealed Bids will be received from qualified contractors until this date and time at this location: |
|
UCCS will be converting its telephone service to a Voice Over Internet Protocol (VOIP) system over Winter Break. UCCS is seeking bids for upgrades to various data closets campus-wide as described in the UCCS CAMPUS VOIP PROJECT NARRATIVE. Mandatory Meeting to be held Tuesday, December 14, 2010 at 10:00 a.m. at UCCS Campus Services Building, Room 204, 1420 Austin Bluffs Pkwy, Colorado Springs, CO 80918 Bid Documents |
|
Questions and Answers I have a list of the panels that we do not have load information for, and will need to have a 30 day metering done on them. They are as follows: · Engineering Building - panel "401" and both main distribution panels "MDC1" and "MDC2". · University Hall - panel "R4" and both main distribution panels "MSB" and "MDP2". · Keystone - panel "ERC" and the main distribution gear MSBC1". · University Center - main switchboard "MDP". This pretty much means that these 4 buildings will not be able to be done over the Christmas break. 2) Should we wait until the data logger info to bid these four buildings since we are unsure that the way we were instructed to bid these will actually be the installation methods? I will provide a proposal for the data logger. A) No, you should not wait to bid the four buildings that require data logging. Bid per the narrative. 3) I see the floor plans however there is no scale and in the floor plans for the university center the room numbers on the narrative are not on the floor plans to verify lengths. Can you direct me to where the PDF files are? A) The posted pdf drawings are not to scale. State your assumptions in your bid. |
|
Addendum 1 |
|
Architect Selected: Anderson Mason Dale Architects Shortlist of Architects: Anderson Mason Dale Architects Davis Partnership Architects H+L Architecture Page Southerland Page RTA Architects |
|
Bid Documents/Project Documents |
|