UCCS: Home • Calendar • Map
Facilities Services
  • Home
  • Students, Faculty & Campus Community
  • Contractors & Bidders
  • Architects, Engineers & Consultants
  • Physical Plant
  • Planning, Design and Construction
    • About Us
    • Campus Design and Construction Standards
    • Planning Documents
    • Projects Out for RFQ/RFP
    • Projects Out for Bid
    • Projects Under Construction
    • Completed Projects
    • State Building Forms
  • Standing Order Contract Program
  • Maps and Floor Plans
  • Sustainability
  • Website Map
  • Meet the Staff
  • Find Us

Control Erosion and Storm Water Runoff-Mountain Lion Way

Control Erosion and Storm Water Runoff - Mountain Lion Way


Project Number 13-002

PROJECT AWARDED TO:   Mel-Ro Construction Inc.

 Mandatory Pre-Bid Meeting: Monday March 11, 2013 1:30 pm in the Campus Services Building Room 204

  • Mandatory Meeting Attendee Sign-In Register

Bids Due: Monday, April 1, 2013 2:00PM at Campus Services Building Front Desk

  • Bid Tabulation Form (04/02/2013)

Other Required Forms and Documents

  • Notice to Bid
  • Information to Bidders
  • Bid (SBP 6.13)
  • Bid - Appendix A - Alternates & Unit Prices
  • Contractors Agreement - Design/Bid/Build (SC 6.21)
  • The General Conditions of The Construction Contract - Design/Bid/Build (SC 6.23)
  • Insurance Requirements A
  • Performance Bond (SC 6.22)
  • Labor and Material Payment Bond (SC 6.221)
  • Specs for project
  • Issues for Bid (Project Drawings)
  • Clarifications and Additional Information - Addendum 1  << POSTED 3/12/2013
  • Additional Project Drawings - (Zipped CAD files)<< POSTED 3/12/2013
  • Addendum 2 << posted 03/26/2013

 

UCCS - University of Colorado Colorado Springs
© University of Colorado Colorado Springs
1420 Austin Bluffs Pkwy, Colorado Springs, CO USA 80918
719-255-8227 (UCCS), 800-990-8227
Copyright | Privacy Statement | Vision and Values
CU - University of Colorado: Boulder | Colorado Springs | Denver | Anschutz Medical Campus