North Nevada Infrastructure

AWARDED TO BRYAN CONSTRUCTION


Project No. 14-021

  • Development of infrastructure for UCCS campus along North Nevada

Project Design Documents


Mandatory Meeting: Wednesday, 16 JULY 2014 @ 10:00 AM MST

  • Meeting will be held in the Campus Services Building (CSB), Room 204 - please refer to the UCCS Campus Map for building locations.
  • Submittals and Proposals from firms not attending this mandatory meeting will be rejected without consideration.
  • A sign-in sheet will be provided at the mandatory meeting, and will be posted here when the meeting has concluded.

E-mail Questions Due Before: July 21, 2014 at 4:00 PM.

Submittals Due Before: July 31, 2014 at 2:00 PM.

  • Proposals are to be submitted in one (1) file, in PDF format via e-mail to: submit@uccs.edu.
  • Proposals larger than 10 MB (UCCS e-mail size limit) may be delivered on a USB drive or CD to the following address:

Reception Desk
Campus Services Building
1420 Austin Bluffs Parkway
Colorado Springs, CO 80918

  • Proposals should not exceed thirty (30) pages, excluding required attachments.
  • Submittal deadline is the same regardless of delivery method.
  • Late submittals will be rejected without consideration.

Shortlist of Firms Selected for Interview

  • Bryan Construction
  • JE Dunn Construction
  • R.E. Monks Construction